Thursday, 28 March 2013

week 6 ( 4/3/2013 - 8/3/2013 )


Core circuit


      The core circuit is the most important in this project because it act as a control panel to operate power distribution monitoring system. This circuit is the main part that contains Programmable Interface Circuit (PIC) to control the whole project operation. It collects data in volt and celcius to secure the condition of cable in distribution system. 


       The figure above shows the temporary main core circuit.  

No comments:

Post a Comment