Tuesday, 9 April 2013

week 10 ( 1 / 4 / 2013 - 5 / 4 / 2013 )

Meeting with supervisor


         During this week, arrange a schedule with my project supervisor to discuss and update about my project result. Fortunately, my project has already operate according to project block diagram. My project supervisor satisfied on my project work.Set an another appointment with supervisor next week to demonstrate my project before project presentation day. 
             Supervisor reminds about Final Year Project 2 assessment. All the assessment should be completed   to pass this subject. So, the Final Year Project assessment include logbook, project report, project presentation and progress report. 

Week 9 ( 25 / 3 / 2013 - 29 / 3 / 2013 )

Relay circuit

     A relay circuit is typically a smaller switch or device which drives (opens/closes) an electric switch that is capable of carrying much larger current amounts. Or a circuit which operates the coil or electronic actuator from one source and uses a separate power source to drive an isolated device. 

Thursday, 4 April 2013

week 8 ( 18/3/2013 - 22/3/2013 )

Test Circuit

       After hardware and software assembled, the next project progress is to test the circuits either well-functioned or not. Based on my project block diagram, the inputs which is voltage and temperature sensors will continuously monitor its value within the range. To ensure the value within the range, the inputs sends a signal to Programmable Interface Controller (PIC) to process until it detects the value is over range. Then, it converts from digital to analogue using MAX232 and GSM transmits the signal and receive by specified person.
           So, the result that i get was completely worked and there is minor error happens related with GSM modem initial code. It has been solved and it can proceed to the next project progress.