         In this week, i have discussed with TNB distribution worker about designing the project. All the design  ideas, i have compiled together and finalize that. Both voltage and temperature sensor will connected at distribution cable to detect overvoltage and high temperature condition. The manner that i have done as shown below:


  • Create the initial prototype 
  • Identify the operation flow
  • Collect and record the result simulation data
  • Finalize the prototype